Generate and validate AIDC building, equipment, power, cooling, and network systems from one shared 3D node and edge graph. The 3D Viewer, SLD, Sankey, pandapower, reports, BOM, estimates, and procurement source data all continue from the same EngineSession.
Checking session
Canonical design sequence
The engine starts from owner requirements and moves through traceable engineering gates before procurement, commissioning, and operations handover.
OPR -> BOD -> standards matrix -> IT load/rack model -> electrical topology -> cooling topology -> building/site fit -> code/AHJ/fire/security validation -> cost/procurement -> commissioning test matrix -> operations handover